Friday 17 February 2017

Bridges by Mudathir

On the 12th of January 2017 we went to build a bridge was an cable stayed bridge. The first thing we did was put or helmets on and put or high vest jacket and they told us our jobs. Then we got to connect all the stuff till the were all together and put on tight one of the groups were fast and the other team took long. A the end we all got to walk on the bridge to see if it will be able to hold or weights it was shaking a lot at one time all the teacher went on to have a shot. At the end we needed to take all the stuff out and after we got given small toys.